Post & Beam Deck Addition in North Vancouver

Retaining walls are long complete and the new deck with roof are in the final stages of completion. We carried the existing post and beam structure from the interior of the home to the new addition giving the appearance of a continuity of space form inside to out. A floating deck is yet to be built to the left side and will be connected to the main deck and lawn with broad steps, spanning the width of the deck. All carefully planned to eliminate the need for view-blocking guard rails.

Leave a Reply

Your email address will not be published. Required fields are marked *